RFQ turnaround 24–48h · inbound queries only
Home / Alarm Library / Fanuc / SP9033

Fanuc alarm SP9033: SHORTAGE POWER CHARGE (PSM FAULTY)

spindle alarm (serial spindle, alpha i) · Fanuc 0i-D

What it means

The DC link was not charged to the expected voltage within the specified time after the main contactor closed. The pre-charge circuit failed to bring the capacitor bank up, so the amplifier refuses to enter the ready state.

Likely causes

  • Magnetic contactor sequence wrong or closing too late (check CX48 monitoring wiring)
  • Deteriorated DC link capacitors or failed pre-charge resistor
  • Open phase or low/unbalanced input voltage
  • Phase-sequence mismatch between monitoring input and main circuit

Triage note: Often appears alongside SV0442; verify contactor timing and CX48 wiring first.

Replacement parts

We supply the following units for this alarm — tested, warranty-backed:

Need the part urgently?

Send us alarm SP9033 with your machine details — typical RFQ turnaround is 24–48h.

Request a QuoteFanuc catalog